How a software project runs from proposal to delivery

2 October 20264 minVersion 1.0

Summary

The software development process is the full set of steps from defining a need to launching working software and maintaining it. The names of the steps vary from company to company, but the essence is the same: understand what needs to be built, put it in writing, develop and show it piece by piece, accept it against criteria and look after it once it is live.

Author

Tarık İsmet ALKAN →

Organisation

Kulular Bilişim Teknolojileri Limited Şirketi

One of the first questions from an organisation that wants software built is how the process will run. What they will see and when, what will be expected of them, and when the work will count as finished.

In this post I describe the steps a project goes through from the first meeting to maintenance. The steps are not the same length in every project. In a small piece of work, several of them fit into a single meeting. But none is skipped, because a skipped step comes back as a surprise at the end of the project.

First meeting

We don’t talk about price at the first meeting. We try to understand what is wanted, how the work is done today and what needs to change. Who will use it, what data it will handle, which systems it will talk to.

At the end of this meeting we sometimes say there is no need for custom software. If an off-the-shelf product does the job, saying so from the start saves everyone’s time.

Discovery

If the need is not yet clear, we suggest a short discovery phase. A few workshops, a look at the existing systems and data, mapping the workflow step by step. The output of discovery is a written document: scope, user roles, integrations, data, known risks and unknowns.

This is the cheapest phase of the project and the one that saves the most money. Correcting a misunderstood need in a document is far easier than correcting it in code.

Proposal

The proposal is based on the discovery document. For each work package it sets out what will be done, how long it will take, what is expected of the organisation and against which criteria it will be accepted. What is out of scope is also written down separately. Who keeps the source code and intellectual property, and how maintenance will work, are settled here.

Design

Before writing code, we design the data model, the permission structure and the main screens. We show the screen mock-ups to the organisation’s real users. Objections raised at this stage are far cheaper than those raised later.

If personal data will be processed, this is also the stage where we decide which data is collected and why, who can see it and how long it is kept. These are not features to add later. They are part of the architecture.

Development

We run development in short cycles. At the end of each cycle the organisation sees a working version in a test environment. If something has been misunderstood, it is noticed within a few weeks.

Automated tests run on every change. If a test fails, that version does not move forward. We explain how we do this on our own site in a separate post.

Testing and acceptance

Acceptance is carried out against the criteria written in the proposal. For each feature, concrete criteria of the kind “in this situation it gives this result”. The organisation tries these criteria with its own data, any points that do not match are recorded and fixed.

When acceptance criteria are not written down, the “does it work?” argument is inevitable. We explain why in our post on acceptance criteria.

Go-live

Go-live is not a day but a small plan. If data is being migrated from the old system, trial migrations are done in advance. How to roll back if something goes wrong is written down. Users get short training, and questions are answered quickly in the first weeks.

Maintenance

After delivery, security updates, infrastructure upgrades and small improvements carry on. The scope of maintenance and how quickly a problem will be dealt with are put in writing at the proposal stage.

The source code, documentation and deployment steps are handed over to the organisation. That way, if the organisation one day wants to carry on with another team, it can.

The organisation’s role

Every one of these steps needs a counterpart on the organisation’s side. Someone who knows the workflow, can answer questions quickly and can try out interim versions. What slows projects down is usually not a technical problem but the lack of this counterpart.

In short

First meeting, discovery, proposal, design, development, acceptance, go-live and maintenance. The steps get shorter or longer depending on the size of the project, but none is skipped. Having in writing what will be delivered at the end of each step is what keeps surprises away at the end of the project.

Frequently asked

01How long does a software project take?
Depending on scope, anywhere from a few weeks to a year. The duration is driven most by the number of integrations, the state of the data to be migrated and how available the decision makers on the organisation’s side are. By the end of the discovery phase, the duration becomes a far more solid figure than the estimate at the first meeting.
02What is expected of the organisation during the project?
Above all, a counterpart who can make decisions. Someone who knows the workflow, can answer questions within a few days and can try out interim versions. Most projects slow down not because of a technical problem but because this counterpart is missing.
03What happens if the scope changes mid-project?
It will change, and that is normal. What matters is that the change is recorded in writing, its effect on time and cost is discussed and the acceptance criteria are updated to match. A change that is not recorded turns into a dispute on delivery day.

Sources

  1. 01ISO/IEC/IEEE 12207:2017, Systems and software engineering: software life cycle processesDefinition of software processes from development to maintenance

Suggested citation

Tarık İsmet Alkan. “How a software project runs from proposal to delivery”. Kulular Teknoloji, version 1.0, 2 October 2026. https://kulular.com.tr/en/writing/how-a-software-project-runs

Kulular Teknoloji

We build this for organisations

Kulular Teknoloji is a software company based in Ankara. We build bespoke software, AI and data systems for organisations. If you have a similar need, tell us briefly about your project and we will plan a first meeting together.

  • Software development process
  • Project management
  • Custom software
  • Acceptance criteria